Most feasibility studies that are rejected by a lender are not wrong. They answer a different question from the one the credit committee is asking. A sponsor's study sets out to show that a project can work. A bankable study shows how it performs when things go wrong, and whether the debt is still repaid.
Bankable means the lender can rely on it
"Bankable" is not a quality grade. It means that a lender, its credit committee and its technical adviser can rely on the study's conclusions without having to rebuild them. In practice, that requires four things: an independent author, inputs traced to evidence, a financial model that the lender can audit, and a risk analysis that goes further than the base case.
A study commissioned and written by the sponsor's own team can still be useful. However, it will normally be treated as a management case, and the lender will commission its own review before relying on any figure in it.
What a credit committee reads first
Credit papers are built around a short list of questions. A bankable study answers them directly and early.
- Demand. Who pays, how much, and how sure are we? Volumes and prices should come from contracts, independent market work or observed data, not from the sponsor's targets.
- Cost and schedule. Is the capital cost estimate at a defined accuracy class, with contingency sized to the level of engineering completed? Is the schedule realistic for the location and the contractor?
- Cash flow available for debt service. What are the minimum and average debt service cover ratios in the base case, and in each downside?
- Downside. What combination of lower revenue, higher cost and delay breaks the debt? How far is that from the base case?
- Permits and land. What is in hand, what is pending, and what could stop the project?
Where studies usually fall short
The same weaknesses come up again and again when studies are reviewed for financing.
- The market section is generic. Industry growth rates do not show that a particular plant will sell its output at a particular price. The study needs offtake terms, a customer list or a competitive analysis for the specific catchment.
- Capex is quoted, not estimated. A single EPC quotation without a basis of estimate, exclusions list or contingency analysis gives little comfort.
- Operating costs are a percentage of revenue. Lenders want costs built up from staffing, energy, maintenance and consumables, so that they can be tested.
- Sensitivities are one-at-a-time. Moving one variable by ten per cent tells the reader little. Combined downside scenarios, and a break-even analysis for each key driver, are more useful.
- The model is locked or hard-coded. If the lender's model auditor cannot trace an output back to an input, the study's numbers will not be used.
Match the level of study to the decision
Not every decision needs a full bankable study. A scoping or pre-feasibility study, with estimates at plus or minus 25 to 30 per cent, is enough to choose between options and decide whether to spend more. A bankable study, with costs normally within plus or minus 10 to 15 per cent and contracts largely agreed, is what supports financial close. Starting a bankable study before the main options are settled usually means paying for it twice.
How to make an existing study bankable
Where a sponsor already has a feasibility study, it is often quicker to commission an independent review than to start again. The review tests each input against evidence, rebuilds or audits the model, adds the downside scenarios a lender needs, and lists the gaps that must be closed before financing. The result is a study the lender can rely on, together with a clear list of actions for the sponsor.
If you are preparing a project for financing, our feasibility studies page sets out what we cover at each stage, and our advisory team can audit an existing model.
Discuss a transaction or project
Tell us what you need answered and when. We reply with a scope, a timetable and a fixed or capped fee.
Request a proposalMore insights
- Due diligence
Quality of earnings: the adjustments that move the price
How a quality of earnings review moves from reported to adjusted EBITDA, and why net debt, working capital and cash conversion matter as much.
- Restructuring
Independent business reviews: the first two weeks
The questions a lender should answer in the first two weeks of an independent business review, and what the report should contain.
- Restructuring
Building a 13-week cash flow that creditors trust
How to build a weekly 13-week cash flow forecast from receipts and payments, report variances, and earn the confidence of lenders.