A feasibility study should answer one question clearly: should this project go ahead, and on what terms can it be funded? We test the market, the technology, the cost, the regulation and the money together, and write the result in the form lenders and investors expect.

Project stagesConcept, pre-feasibility, bankable, pre-financial close
Project typesGreenfield, brownfield, expansion, conversion, PPP
Who relies on itSponsors, lenders, DFIs, investors, governments
Typical timingPre-feasibility 4 to 8 weeks, full study 8 to 16 weeks

Types of feasibility study

Studies are staged so that spend on detailed work is only committed once the earlier stage says the project is worth pursuing.

StudyPurposeCost estimate accuracy
Opportunity or concept studyScreen an idea, identify the main options and fatal flawsOrder of magnitude, roughly ±40 to 50%
Scoping study (mining and resources)First economic view of a defined resource, to decide whether to fund pre-feasibilityRoughly ±30 to 50%
Pre-feasibility studyCompare options, select a preferred case, decide whether to fund a full studyRoughly ±25 to 30%
Full or definitive feasibility studySupport the final investment decision with an engineered base caseRoughly ±10 to 15%
Bankable feasibility studyA full study written to lender standards, ready for due diligence by the lenders' advisersRoughly ±10 to 15%, with lender sensitivities
Techno-economic feasibility report (TEFR)Combined technical and economic case, common for industrial and process projects and bank applicationsDepends on stage
Detailed project report (DPR)Implementation-ready report for government and infrastructure approvalsRoughly ±10%
Independent review of a studyA second opinion on a study prepared by others, for lenders or boardsTests the existing estimate

Market and demand analysis

Most failed projects failed on demand, not engineering. We build the demand case from independent evidence and test it hard.

What we analyse

  • Market size, segmentation and growth, historic and forecast
  • Supply and demand balance, existing and planned capacity
  • Competitor mapping, pricing and market share capture
  • Customer, offtaker and tenant demand evidence
  • Price forecasts for products, commodities, tariffs or rents
  • Traffic and revenue for toll roads, bridges, ports and airports
  • Absorption, occupancy and rental studies for real estate and hotels
  • Import substitution and export market potential

What you receive

  • Demand model with base, high and low cases
  • Price and volume assumptions for the financial model
  • Market risks and how they affect revenue
  • Ramp-up profile to stabilised operation

Technical feasibility

We establish whether the project can be built and operated as intended, with proven technology at the planned capacity.

What we analyse

  • Technology and process options, licensors and maturity
  • Capacity sizing and plant or asset configuration
  • Site conditions, geotechnical and topographical constraints
  • Raw materials, feedstock, fuel, water and power availability
  • Utilities, grid connection and access infrastructure
  • Layout and logistics, inbound and outbound
  • Construction method and contracting strategy (EPC, EPCM, multi-contract)
  • Operations and maintenance model, staffing and skills
  • Independent review of FEED and engineering design packages

What you receive

  • Recommended technical configuration with reasons
  • Process or design basis summary
  • Technical risk register
  • Inputs for the cost estimate and schedule

Capex, opex and schedule

The cost estimate is where optimism hides. We build it from quantities and benchmarks and set a contingency that matches the risk.

What we analyse

  • Capital cost by package: land, civil, equipment, installation, owner's costs
  • Benchmarking against comparable projects
  • Contingency and escalation, by risk rather than a flat percentage
  • Operating costs: labour, energy, consumables, maintenance, insurance
  • Lifecycle and major maintenance costs
  • Implementation schedule, critical path and long-lead items
  • Pre-operative expenses and working capital at start-up

What you receive

  • Capex and opex estimates with stated accuracy
  • Schedule to commercial operation
  • Cost and schedule sensitivities

Financial feasibility

We build an integrated financial model that shows whether the project pays back its investors and services its debt under realistic and stressed conditions.

What we analyse

  • Project and equity IRR, NPV and payback
  • Debt sizing by DSCR, LLCR and gearing
  • Funding structure: equity, senior and mezzanine debt, grants, ECA cover
  • Cash flow waterfall, reserve accounts and distributions
  • Tax, depreciation and incentives
  • Break-even price, volume and cost
  • Sensitivity, scenario and Monte Carlo analysis
  • Levelised cost (for example LCOE for power)

What you receive

  • Fully linked financial model in Excel
  • Model book documenting assumptions and sources
  • Base, lender and downside cases
  • Summary of returns and debt capacity

Economic and social cost-benefit analysis

For public, PPP and development-finance projects, the question is whether the project is worth it for the economy, not only for its investors.

What we analyse

  • Economic IRR and NPV using shadow prices
  • Time savings, vehicle operating cost savings and safety benefits for transport
  • Employment, tax and foreign exchange effects
  • Distributional impacts and affordability

What you receive

  • Economic analysis in the format expected by DFIs and governments
  • Sensitivities on the key benefit drivers

PPP and value for money

For governments and bidders, we test whether a project should be delivered as a public-private partnership and how risk should be shared.

What we analyse

  • Value for money against a public sector comparator
  • Risk allocation matrix between authority and private partner
  • Payment mechanism: availability, user charges, shadow tolls, minimum revenue guarantees
  • Fiscal affordability and contingent liabilities
  • Market sounding with investors, lenders and contractors

What you receive

  • PPP options analysis and recommended structure
  • Value-for-money and affordability assessment
  • Inputs to the tender and concession documents

Legal, regulatory and permitting review

We map every approval the project needs, the order it needs them in, and the effect on schedule and cost. Legal advice on specific laws is provided by licensed counsel in the jurisdiction.

What we analyse

  • Licences, permits and approvals path with timelines
  • Land rights, zoning and acquisition
  • Concession, tariff and regulatory frameworks
  • Foreign ownership and investment rules
  • Available incentives, free zones and tax holidays

What you receive

  • Permitting roadmap and critical approvals
  • Regulatory risks and their effect on the schedule

Environmental and social

Environmental and social requirements change cost and schedule. We include them in the base case from the start.

What we analyse

  • Environmental and social screening and impact scoping
  • Alignment with IFC Performance Standards and Equator Principles
  • Emissions, water use and waste
  • Climate risk and resilience
  • Community, land and resettlement issues

What you receive

  • Environmental and social risk summary
  • Mitigation measures with cost and timing
  • Scope for the full impact assessment

Risk assessment

Every study includes a quantified view of what could go wrong and what it would cost.

What we analyse

  • Risk register across market, construction, technology, operations, finance, regulation and country
  • Probability and impact scoring
  • Scenario and Monte Carlo analysis on IRR and debt service
  • Mitigation options: contracts, insurance, hedging, guarantees

What you receive

  • Quantified risk register
  • P50 and P90 outcomes for key metrics
  • Recommended risk allocation

Bankability and funding strategy

A project can be feasible and still not be bankable. We test the project the way a lender will and show what needs to change for it to be financed.

What we analyse

  • Lender requirements: cover ratios, tenor, security, sponsor support
  • Offtake, supply and EPC contract strength
  • Funding options: commercial banks, DFIs, ECAs, bonds, private credit, equity partners
  • Currency and interest rate risk
  • Conditions precedent likely at financial close

What you receive

  • Bankability assessment with gaps to close
  • Indicative financing structure and term sheet assumptions
  • Lender-ready information pack

Site selection

Location fixes much of a project's cost for its whole life. We compare sites on the factors that drive cost and risk.

  • Weighted multi-criteria comparison of candidate sites
  • Land cost, access, utilities, labour, logistics and incentives
  • Hazard, environmental and permitting constraints
  • Recommended site with cost and schedule implications

Expansion and brownfield projects

Expanding or upgrading an existing asset brings its own questions: what the current asset can carry, how to build without stopping operations, and the true incremental return.

  • Condition and capacity of existing assets and utilities
  • Debottlenecking and modernisation options
  • Incremental capex, opex and returns compared with the as-is case
  • Construction phasing and shutdown planning
  • Refinancing of existing debt alongside new funding
  • Conversion and repurposing of assets, for example real estate change of use

Contents of a full feasibility report

A typical bankable study is organised as follows, adjusted to the sector and the reader.

1. Executive summary

Recommendation, key metrics, key risks and conditions.

2. Project description

Sponsor, location, scope, capacity and timeline.

3. Market analysis

Demand, supply, prices and revenue assumptions.

4. Technical study

Technology, configuration, site, utilities and inputs.

5. Implementation plan

Contracting strategy, schedule, organisation.

6. Capex and opex

Estimates, contingency and benchmarks.

7. Financial analysis

Model outputs, returns, debt capacity and funding plan.

8. Economic analysis

Where required, economic returns and wider benefits.

9. Legal and regulatory

Approvals path, land and concessions.

10. Environmental and social

Impacts, mitigation and standards.

11. Risk analysis

Risk register, sensitivities and mitigation.

12. Conclusions

Go or no-go, conditions and next steps.

Planning a project? Tell us the stage, the sector and the decision you need to make.